ADVANCED CABLE ACCESSORIES

ADVANCED CABLE ACCESSORIES

Blue Sky Hotel, Balikpapan | Tuesday -Wednesday  19th – 21 Oktober  2011  | 08.00– 16.00 WIB | IDR  6.500.000, – / participants non Residensial


Course Description:

Professional “On-site” training on Distribution underground cable accessories from 5KV – 69KV from various manufacturers. The course is designed according to the type of cable and cable accessories utilized by your company.

Who Should Attend:

This course is recommended for Maintenance Electricians, Electrical Contractors, Safety Inspectors, Supervisors, Engineers.

Course Objectives:

In this course participants will learn:

  • Overview of Tape Products
  • Electrical Tape Utilization
  • Overview of Low Voltage Splicing
  • How to perform Low Voltage Splicing
  • Overview of High Voltage Terminations
  • How to perform a High Voltage Termination
  • Overview of High Voltage Splicing
  • How to perform a High Voltage Tape Splice
  • Overview of High Voltage Premolded Splicing
  • How to perform a High Voltage Premolded Splice

Course Pre-requisites:

  • General Safety Procedures/Practices
  • Basic Electrical theory

Required Materials:

  • Cable pieces
  • High Voltage tools

 

Course Outline:

I. INTRODUCTION

  1. Class Introductions
  2. Course Overview
  3. Documentation Overview
  4. Practical Application
  5. Jobsheet #1 – Perform an undemonstrated 1KV tape splice
  6. Overview of practical application

II. Fundamentals of Low Voltage splicing

  • Overview of low voltage splicing methodologies
  1. Resin
  2. Tapes
  3. Heat shrink
  4. Cold Shrink
  • Overview of low voltage Cold Shrink Technologies
  1. Cold Shrink Technology definitions
  2. Cold Shrink applications
  3. Comparative analysis of cold shrink vs. heat shrink
  • Practical Application
  • Jobsheet #2 – Perform a 3/Conductor 1KV teck cable splice

III. Fundamentals of High Voltage Termination

High Voltage Functional elements

  1. Cable components
  2. Electrical characteristics

High Voltage Termination Techniques

  • Termination Classifications
  1. Class 1 Terminations
  2. Class 2 Terminations
  3. Class 3 Terminations
  • Cable Preparation
  • nstructors demonstration of a Class 1 Termination procedures

Practical application

  • Jobsheet #3 – Perform a Class 1 Termination

 

IV. Fundamentals of High voltage Splicing

A.    High Voltage Tape splicing Techniques

  1. Cable components
  2. Electrical characteristics
  3.  Instructors demonstration of cable preparation

B.    Practical application

  1.  Jobsheet #4 – Perform a 15KV mono conductor cable tape splice

C.    High voltage Premolded splicing Techniques

  1. Comparative analysis of tape splice vs. premolded splicing
  2. Cable Components
  3. Overview of cable splicing

D.    Practical Application

  1.  Jobsheet #5 – Perform a 15KV mono conductor premolded splice

V. Summary

  1. Review course outline
  2. Questions and Answers

VI. Performance Evaluation

  1. Written Exercise #1

INSTRUCTOR

Ir. M. Isnaeni, MT

 

METHODS

During the training, participant will be in interactive learning mode, by actively join the group discussion, sharing concepts, role plays, games and case studies.

Waktu dan tempat:

  • Blue Sky Hotel, at Let. Jend. Suprapto I, Balikpapan Kalimantan Timur.
  • Tuesday -Wednesday  19th – 21 Oktober  2011
  • 08.00– 16.00 WIB

Investasi:

  • IDR  6.500.000, – / participants non Residensial
  • Harga Spesial Rp.6.000.000 untuk pengiriman minimal 3 orang peserta.

FASILITAS

  • Training Modules
  • Training Kit
  • Certificate, Exclusive Souvenir
  • Dinner
  • City Tour (Optional)
  • Coffee Break

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
  14. Captcha
 

cforms contact form by delicious:days