Piping & Pipeline

Plant Design Management System

Plant Design Management System Hotel Aston Tropicana / Hotel Papandayan Bandung | Selasa-Jumat, 10-13 Juli 2012 | Rp 8.500.000/peserta  Hotel Aston Tropicana / Hotel Papandayan Bandung | Selasa-Jumat, 24 – 27 Juli 2012  | Rp 8.500.000/peserta  Hotel Aston Tropicana / Hotel Papandayan Bandung | Selasa-Jumat, 7-10 Agustus 2012 | Rp 8.500.000/peserta Hotel Aston Tropicana / Hotel Papandayan Bandung | Selasa-Jumat, 28-31 Agustus …

Plant Design Management System Read More »

Pipeline Design & Constructions

Pipeline Design & Constructions Hotel Aston Tropicana / Hotel Papandayan Bandung | Selasa-Jumat, 03 – 06 Juli 2012 | Rp 8.500.000/peserta  Hotel Aston Tropicana / Hotel Papandayan Bandung | Selasa-Jumat, 17 – 20 Juli  2012 | Rp 8.500.000/peserta  Hotel Aston Tropicana / Hotel Papandayan Bandung | Selasa-Jumat, 31 Juli – 03 Agustus 2012 | Rp 8.500.000/peserta Hotel Aston Tropicana / Hotel …

Pipeline Design & Constructions Read More »

PIPING SYSTEM DESIGN INSTALLATION AND MAINTENANCE

PIPING SYSTEM DESIGN INSTALLATION AND MAINTENANCE – Yogyakarta Hotel Puri Artha, Yogyakarta | 8-10 Agustus 2012 | IDR  5.500.000 per participant Hotel Puri Artha, Yogyakarta | 18-20 September 2012 | IDR  5.500.000 per participant Hotel Puri Artha, Yogyakarta |  2-4 Oktober 2012 | IDR  5.500.000 per participant Hotel Puri Artha, Yogyakarta | 6-8  November 2012 | IDR  5.500.000 per participant …

PIPING SYSTEM DESIGN INSTALLATION AND MAINTENANCE Read More »

PRESSURE SAFETY VALVE

PRESSURE SAFETY VALVE The Hyatt Hotel Bandung | 11-13 April 2012 | IDR 6.999.000,-/participant The Hyatt Hotel Bandung | 10-12  July 2012 | IDR 6.999.000,-/participant The Hyatt Hotel Bandung | 10-12 October 2012 | IDR 6.999.000,-/participant ABSTRACT The function of a pressure safety valve is to protect pressure vessels, piping systems, exchanger, boiler and other equipment from pressures …

PRESSURE SAFETY VALVE Read More »

MECHANICAL SEAL

MECHANICAL SEAL Hotel IBIS, Jogjakarta | 5-7 maret 2012   | 08.00 – 16.00 WIB | Rp. 7.000.000 per peserta Description Mechanical Seal adalah komponen yang digunakan menyekat antara dua fluida kerja (zat cair dan gas) sehingga tidak terjadi kebocoran fluida kerja yang melewati sebuah poros. Kemampuan penyekatan (sealing performance) serta umur seal sangat bergantung kepada …

MECHANICAL SEAL Read More »

Pipelines

Pipelines Yogyakarta | 20-23 February 2012 | IDR 7,000,000.00 per participant Yogyakarta | 04-07 June 2012 | IDR 7,000,000.00 per participant Yogyakarta | 01-04 October 2012 | IDR 7,000,000.00 per participant DESCRIPTION The course will review the basic requirements of the ASME B31 Code for Pressure Piping. Topics include: design conditions, pipe sizing, pressure design, flexibility analysis, material, fabrication, examination, testing, …

Pipelines Read More »

Pipeline Design & Constructions

Pipeline Design & Constructions Hotel IBIS, Yogyakarta | 21-23 Februari 2012 | Rp. 6.500.000 per peserta (Non Residential)   Deskripsi Sebagai sarana transportasi fluida, pemipaan memegang peranan sangat penting dalam proses produksi, terutama pada perusahaan oil & gas, di industri kimia dan perusahaan sejenis lainnya. Dengan tujuan  untuk mengembangkan pengetahuan yang lebih dalam kepada para …

Pipeline Design & Constructions Read More »

Pipeline Design & Constructions

Pipeline Design & Constructions Hotel All Season, Yogyakarta | 21-23 Februari 2012 | Rp  7.500.000,- Hotel Scarlet Dago,  Bandung | 22-24 Mei 2012  | Rp  7.500.000,- Hotel Harris Tebet , Jakarta | 25-27 September 2012 |  Rp  7.500.000,- Hotel Ibis, Semarang | 27-29 November 2012  |  Rp  7.500.000,-   DESKRIPSI Sebagai sarana transportasi fluida, pemipaan memegang peranan sangat penting dalam proses …

Pipeline Design & Constructions Read More »

Pipeline Design & Constructions

Pipeline Design & Constructions Hotel All Seasons, Yogyakarta |  21 s.d 23 Februari 2012 | Rp. 6.500.000,-/participant (non residential) Hotel All Seasons, Yogyakarta | 24 s.d 26 April 2012 | Rp. 6.500.000,-/participant (non residential) DESKRIPSI Dalam perusahaan oil & gas, penggunaan pipa merupakan suatu keharusan. Oleh karena itu melakukan design dan kontruksi pemasangan pipa harus dilakukan …

Pipeline Design & Constructions Read More »

Centrifugal pump : operation & maintenance – (PASTI JALAN)

Centrifugal pump : operation & maintenance The Phoenix Hotel, Jakarta | November 1st – 4th 2011 | IDR 9.500.000,- / participant (non residential) Description Assuming that a plant is a body of human being, pumps are the “heart” of the body. Those play very important and vital roles to flow the “blood” of a plant. …

Centrifugal pump : operation & maintenance – (PASTI JALAN) Read More »