Menganalisis dan merekomendasikan solusi paling efektif yang tersedia dalam operasi dan desain chiller dan cooling tower
Bandung | 12 – 14 Oktober 2020 | Rp 6.500.000/ peserta
Bandung | 09 – 11 November 2020 | Rp 6.500.000/ peserta
Bandung | 30 November – 02 Desember 2020 | Rp 6.500.000/ peserta
Jadwal Training 2020 Selanjutnya …
CHILLER AND COOLING TOWER TRAINING INTRODUCTION
Chiller and cooling tower are used in HVAC, power plant and refrigeration system. Design and operation of the equipments are very important to know for an engineer. This course covers the fundamentals and practical applications for understanding of design and operation of the chiller and cooling tower. The comprehensive coverage of the basic theory, system analysis, optimization concept, and calculation methods to make this the most complete course available today in achieving an economical system.
CHILLER AND COOLING TOWER TRAINING BENEFITS
Enable to analyze and recommend the most effective solution available in operation and design for chiller and cooling tower. Enable to utilize energy as possible as saving for chiller and cooling tower system. Familiar and better understanding of all aspects relating to efficient chiller and cooling tower in commercial application.
WHO SHOULD ATTEND THIS TRAINING?
- Technicians
- ME engineers
- and other who responsible for selecting, mechanical equipments
CHILLER AND COOLING TOWER TRAINING OUTLINE
- Chiller System and Basics
- Work Principle of Chiller
- Piping Basics
- Pumping Basics
- Control Valve Basics
- Loop Control Basics
- Air-Cooled Chillers
- Water-Cooled Chillers
- Piping and Diversity
- Chiller Construction and Safety
- Dual Compressor Chillers
- VFD Chillers
- System Design Changes
- Mechanical Room Safety Standard
- Single Chiller System
- Basic Operation and Arrangement of Chiller
- Basic Components
- Series Chillers System
- Single Chiller Sequence of Operation
- Parallel Chiller System
- Parallel Chiller Sequence of Operation
- Series Counterflow Chillers
- Using VFD Chillers in Series Arrangements
- System Comparison
- Very Large Chiller Plants
- Primary/Secondary Sequence of Operation
- Chiller Cooling System
- Water-Side Free Cooling
- Direct Waterside Free Cooling
- Parallel Waterside Free Cooling
- Series Waterside Free Cooling
- Waterside Free Cooling Design Approach
- Waterside Free Cooling Sequence of Operation
- Chilled Water Volume
- Chilled Water Temperatures and Ranges
- Minimum Chilled Water Volume
- Estimating System Volume
- Evaluating System Volume
- Cooling Tower
- Cooling Tower Types and Cooling Tower Systems
- General Design Consideration
- Cooling Tower Construction and Installation Requirements
- Tower materials
- Cooling Tower Design and Operation Consideration
- Cooling Tower Water and Bleed-off Water Control
- Improving Energy Efficiency of Cooling Towers
- Hybrid Plants and Energy Saving
- Heat Recovery and Templifiers
- Load Profiles
- Heat Recovery Chillers
- Variable Primary Flow Design
- Variable Primary Flow Sequence of Operation
- Low Delta T Syndrome
- Low Delta T Example
- Low Delta T Syndrome Causes and Solutions
TRAINING INSTRUCTOR
DR. Ir. I Made Astina, M.Eng. and Team
DR. Ir. I Made Astina, M.Eng. is currently assistant professor of mechanical Engineering, Faculty of Mechanical and Aerospace Engineering ITB. He graduated from Mechanical Engineering Department ITB in 1992. Prior to his Ph.D. obtainment in Engineering (thermodynamics, school of science for open and environmental systems) from Keio University Tokyo, Japan in 2004, he received Master of Science in Engineering (mechanical engineering department) from the same university in 1997. His researches concern on thermodynamic, development of new thermal systems, thermodynamic cycles, air conditioning and refrigeration systems. His papers were published in international and national journals, besides he also presents his papers in international and national seminars. Besides teaching at the university, he also has experiences to give short courses for industrial practical engineers and publics and to collaborate practical consultant works.
VENUE
Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll.
TRAINING DURATION
3 days
- 12 Okt 2020-14 Okt 2020
- 09 Nop 2020-11 Nop 2020
- 30 Nop 2020-02 Des 2020
INVESTATION PRICE
- Rp 6.500.000/Person (full fare) or
- Rp 6.250.000/Person (Early Bird, payment 1 week before training) or
- Rp 5.950.000/person (group, there is 3 or more participants from the same company)
FACILITIES FOR PARTICIPANTS
- Training Module
- Flash Disk contains training material
- Certificate
- Stationeries: NoteBook and Ballpoint
- T-Shirt
- Backpack
- Training Photo
- Training room with full AC facilities and multimedia
- Lunch and twice coffeebreak everyday of training
- Qualified instructor
- Transportation for participants from hotel of participants to/from hotel of training (if minimal number of participants from one company is 4 persons)
CHILLER AND COOLING TOWER