COMPLETIONS AND WORKOVERS
Bandung | 27 – 29 Mei 2019 | Rp. 7.950.000 Per Peserta
Bandung | 24 – 26 Juni 2019 | Rp. 7.950.000 Per Peserta
Bandung | 29 – 31 Juli 2019 | Rp. 7.950.000 Per Peserta
Bandung | 14 – 16 Agustus 2019 | Rp. 7.950.000 Per Peserta
Jadwal Training 2019 Selanjutnya …
COMPLETIONS AND WORKOVERS TRAINING DESCRIPTION
Completions and Workovers provides an integrated introduction to many facets of completion and intervention technology. The material progresses through each of the major design, diagnostic, and intervention technologies concluding with some common remedial measures and well abandonment. The course focuses on the practical aspects of each of the technologies, using design examples – successes and failures – to illustrate the key points of the design and the risks/uncertainties. The overall objectives of the course focus on delivering and maintaining well quality.
DESIGNED FOR
Graduates or engineers with experience, engaged in drilling operations, production operations, workover, and completions; petroleum engineering in both the service and operating sectors
YOU WILL LEARN
Participants will learn how to:
- Develop a high level completions strategy for wells in a variety of situations
- Select tubing, packers, and completions flow control equipment
- Appraise/design a suitable flow barrier strategy
- Identify key design considerations for vertical and inclined wells, horizontal, multilateral, HPHT, and unconventional resource wells
- Select an appropriate intervention strategy/equipment
- Identify key features/applicability of the main sand control and well stimulation options
- Assess/specify concerns/remedial measures for formation damage/skin removal
- Develop outline overall strategies for completion and workover programs
COMPLETIONS AND WORKOVERS TRAINING MATERIAL OUTLINE
- Basic well completions design, practices, and strategies
- Well quality and integrity
- Safety aspects of well design
- Wellheads, trees, subsurface safety valves, and flow control equipment
- Material selection guidelines based on corrosion and erosion conditions
- The basic interpretation of inflow and tubing performance to aid tubing size selection
- Tubing design and selection
- Considerations for designing deviated horizontal, multilateral, and multi zone reservoir completions
- Basic completions principles and considerations for subsea, HPHT, and unconventional wells
- Perforating job selection and design
- Formation damage mechanisms and their remediation
- Stimulation design considerations
- Sand control options and their selection
- Wireline, coiled tubing, and hydraulic workover rig operations
- Snubbing
INSTRUCTOR : Dr.-Ing. Bonar Tua Halomoan Marbun and Team
VENUE : Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll
COMPLETIONS AND WORKOVERS TRAINING DURATION : 3 days
- 27 Mei 2019-29 Mei 2019
- 24 Jun 2019-26 Jun 2019
- 29 Jul 2019-31 Jul 2019
- 14 Agust 2019-16 Agust 2019
- 11 Sep 2019-13 Sep 2019
- 28 Okt 2019-30 Okt 2019
- 13 Nop 2019-15 Nop 2019
- 16 Des 2019-18 Des 2019
INVESTMENT PRICE/PERSON
- Rp. 7.950.000/person (full fare) or
- Rp. 7.750.000/person (early bird, payment 1 week before training) or
- Rp. 7.500.000/person (if there are 3 persons or more from the same company)
FACILITIES FOR PARTICIPANTS
- Training Module
- Flash Disk contains training material
- Certificate
- Stationeries: NoteBook and Ballpoint
- T-Shirt
- Backpack
- Training Photo
- Training room with Full AC facilities and multimedia
- Lunch and twice coffeebreak every day of training
- Qualified Instructor
- Transportation for participants from hotel of participants to/from hotel of training – VV (if minimal participants is 4 persons from the same company)