DRILL STRING FAILURE PREVENTION 2
Bandung | 15 – 17 Mei 2019 | Rp. 7.950.000 Per Peserta
Bandung | 26 – 28 Juni 2019 | Rp. 7.950.000 Per Peserta
Bandung | 03 – 05 Juli 2019 | Rp. 7.950.000 Per Peserta
Bandung | 26 – 28 Agustus 2019 | Rp. 7.950.000 Per Peserta
Jadwal Training 2019 Selanjutnya …
DRILL STRING FAILURE PREVENTION 2 TRAINING DESCRIPTION
Drill String Failure Prevention 1 is focused on rig site personnel from entry level through derrickman and also procurement personnel. The intent is to create awareness of how various tools are manufactured and used, how performance limits are established, and how various components are likely to fail. Drill String Failure Prevention 2 builds on these concepts for Drillers through Rig Manager and other Drilling Supervision. The intent is to equip them to make tool selection and string design decisions for typical situations. A calculator is required for both courses.
DESIGNED FOR
Operator, drilling contractor and service company personnel, including rig crews, drillers, rig managers, drilling supervisors, superintendents and procurement
YOU WILL LEARN
Participants will learn how to:
- Identify sizes, weights, grades, connections, and other features of most typically used drill string components.
- Adjust drill string handling practices to reduce failures and cost.
- Determine performance properties of drill string components and apply design margins
- Link mechanical properties of various drill string components to their performance limits
- Determine likely drill string failure situations and how to eliminate them
- Design cost-effective BHAs and match them to your bit
- Identify drilling tools and operational practices to reduce both torque and drag and casing wear
- Diagnose and mitigate vibration to reduce drill string damage and failure
- Optimize drill string inspection programs using the latest industry standards
- How emerging drill string technologies may benefit your operations
DRILL STRING FAILURE PREVENTION 2 TRAINING TRAINING MATERIAL OUTLINE
- Sizes, weights, grades, connections, and other features of most typically used drill string components.
- Drill string handling practices to reduce failures and cost.
- Performance properties of drill string components and apply design margins
- Tension loads
- Torque loads
- Combined tension-torque loads
- Fatigue loads
- Buckling loads
- Mechanical properties of various drill string components to their performance limits
- Drill string failure situations and how to eliminate them
- Design cost-effective BHAs and match them to your bit
- Drilling tools and operational practices to reduce both torque and drag and casing wear
- Vibration to reduce drill string damage and failure
- Drill string inspection programs using the latest industry standards
- Emerging drill string technologies
INSTRUCTOR : Dr.-Ing. Bonar Tua Halomoan Marbun and Team
VENUE : Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll
DRILL STRING FAILURE PREVENTION 2 TRAINING DURATION : 3 days
- 15 Mei 2019-17 Mei 2019
- 26 Jun 2019-28 Jun 2019
- 03 Jul 2019-05 Jul 2019
- 26 Agust 2019-28 Agust 2019
- 23 Sep 2019-25 Sep 2019
- 02 Okt 2019-04 Okt 2019
- 25 Nop 2019-27 Nop 2019
- 16 Des 2019-18 Des 2019
INVESTMENT PRICE/PERSON
- Rp. 7.950.000/person (full fare) or
- Rp. 7.750.000/person (early bird, payment 1 week before training) or
- Rp. 7.500.000/person (if there are 3 persons or more from the same company)
FACILITIES FOR PARTICIPANTS
- Training Module
- Flash Disk contains training material
- Certificate
- Stationeries: NoteBook and Ballpoint
- T-Shirt
- Backpack
- Training Photo
- Training room with Full AC facilities and multimedia
- Lunch and twice coffeebreak every day of training
- Qualified Instructor
- Transportation for participants from hotel of participants to/from hotel of training – VV (if minimal participants is 4 persons from the same company)
DRILL STRING FAILURE PREVENTION 2