OVERVIEW

Provides information and practice to understand the use of the master status panel (MSP) and local control panels (LCP’s) to locate and tag the first out process shutdown event, manual by passes, classess A, B, C, D by passess, process alarms, feedback diagnostics for valves and pumps, and miscellaneous shutdowns. Information on ‘token’ passing, watchdog timers, and data highway plus communications on the SSDS is covered. Proper use the MSP and LCP’s can reduce the downtime associated with an event and provide information to prevent future inadvertent shutdowns.

OBJECTIVES

The MSP and LCP panels provide a wealth of process troubleshooting and optimizing information to the operator. Many platforms lose vital information about their process when operators reset shutdown and alarms without understanding the first out indications and feedback announciators on the MSP. The DAS systems, due to the to,e lags in information gathering, doesn’t provide adequate alarming information to determine the order of event in a shutdown situation. Repeat shutdowns and long shutdown times result from the lack of information. This workshop provides training on how to glean the maximum information from the panels to provide quick return to service and the potential of preventing future shutdowns.

 

OUTLINE

  1. Safety shutdown system overview
  2. Safe charts, the map to safe operations
  3. Vessel instrumentation, pressure, level, flow, and temperature
  4. the local control panel (LCP)
    • First-Out Indications – Subsequent Shutdowns
    • Usage of the Command Row – Bypass, Horn Silence, Repeat, Reset
    • Shutdown Classes – A, B, C, and C/B
  5. The master status panel
    • LCP Summary Panels
    • First Panel Out Indications – Subsequent Panel Outs
    • Manual Bypass Indications – Solid/Blinking
    • Class C Bypass Indications
    • Process Alarm Panels
    • Miscellaneous Shutdown Panel
    • Pump and Valve Feedback Alarm Panels
  6. Hands on exercises
    • Identification of Shutdown Events – First-Outs, Subsequent Outs
    • Shutdown Acknowledgment and Shutdown Resets
    • Identification of Non-Resettable Shutdowns
    • Pump and Valve Feedback Alarms
  7. Session wrap up

 

METODE TRAINING

  • Presentation
  • Discussion
  • Case Study
  • Evaluation

 

Instruktur:

Sutrisno

 

FACILITYS

  • Training Kit
  • Handout
  • Certificate
  •  Lunch
  • 2 X Coffee Break
  • Souvenir

 

PRICE TRAINING

Rp 8.500.000,- / participant / Non residential

TIME AND PLACE

  • 18-21 Februari  2013
  • Jogjakarta Plaza Hotel

 

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
  14. Captcha
 

cforms contact form by delicious:days