GAS TURBINE POWER PLANT
Bali / Batam | March 26th -30th 2012 | 08:00-16:00 WIB | Rp 10.000,000,-/peserta
Description
The objective of this course is to present the factors involved in operation of the gas turbine generating unit, including typical procedures for start-up and shut-down of the unit. On-load operation is discussed with particular emphasis on operating hazards and limitation. The course generally focuses on the heavy industrial type gas turbineThis
Materi
- Objectives of operating maneuvers
- Auto/manual operation
- Start-up prerequisites
- Auxiliary systems required for start-up & Turning gear
- Starting device and torque convertor
- “Break away” and speed adjustment
- Necessity for unit purge & Ignition and light-off
- Speed control to synchronization
- Start-up curve & Minimum load setting
- Change over from start-up to operating conditions
- Permissible rate of loading
- Base load and peak load (overload)
- Governor control, speed droop characteristic
- Exhaust temperature control (override)
- Procedure for shutdown
- Need for even cooling & Spin cooling; turning gear
- Operating hazards; mechanical, thermal, combustion
- Overspeed & Bearing failures & Vibration detectors
- Mechanical unbalance & Turbine blade deposits
- Thermal unbalance, distortion, misalignment
- Conditions required for combustion
- Effects of overfiring & Loss of ignition, explosion
- Accumulation of unburned carbon
- Need for complete monitoring and control system
- Case Studies
Peserta
Power plant managers, supervisors, and engineers, Suppliers of Turbine – Generator components and services.
Koordinator
Ir. HARWIN SAPTOADI, M.Sc
Venue
- Rock Cafe Hotel BALI or HARRIS HOTEL BATAM CENTER
- March 26th -30th 2012
- 08:00-16:00 WIB
Public Training
Course Fee: Rp 10,000,000,-/ participant Nett Non Residential (Min 3)
Fasilitas
- Module / Handout
- Sertifikat
- Souvenir
- Training Kit