Industrial Power Systems Engineering & Device Coordination

Industrial Power Systems Engineering & Device Coordination

The Grand Serela Hotel, Bandung | 28 – 30 Agustus 2013 | IDR 7.499.000,-/participant
The Grand Serela Hotel, Bandung | 19 – 21 November 2013 | IDR 7.499.000,-/participant


Abtract

Power system protection is a branch of electrical power engineering that deals with the protection of electrical power systems from faults through the isolation of faulted parts from the rest of the electrical network. The objective of a protection scheme is to keep the power system stable by isolating only the components that are under fault, whilst leaving as much of the network as possible still in operation. Thus, protection schemes must apply a very pragmatic and pessimistic approach to clearing system faults. For this reason, the technology and philosophies utilized in protection schemes can often be old and well-established because they must be very reliable. while the protective device coordination is the process of determining the “best fit” timing of current interruption occur when abnormal electrical conditions. The goal is to minimize an outage to the greatest extent possible. Historically, protective device coordination was done on translucent log-log paper. Modern methods normally include detailed computer based analysis and reporting.

This course is designed for electrical engineers responsible for industrial or commercial power systems planning, designs for reliability and overall system performance. Students will calculate available short circuit current at varied power system one-line locations to learn how to properly size fuses, cables, breakers and transformers. By learning protective device coordination, load shedding may be accomplished with minimal impact to power system operation.

Course Content

At the completion of this course, students will be familiar with utilization of the following power system tools:

  • Short circuit calculations
  • Power factor improvement
  • Recommended motor / generator / transformer protection
  • Switchgear and system voltage selection
  • Voltage drop / flicker reduction
  • Equipment / system grounding practices
  • Load estimating techniques
  • Plant modernization recommendations
  • Protective device coordination
  1. Fuses and thermal overload devices
  2. Electro-mechanical and solid state relays
  3. Transformers, cables and bus bars
  4. Circuit breakers

 

Instructors

  1. Ir. Teguh Santoso
  2. Tugino, S.T., M.T.

Experts and practitioners who are active as instructors in various training and seminars related to the field of Electrical Engineering

TEMPAT DAN WAKTU

Waktu           : 08.30-16.30 WIB
Tempat         : The Grand Serela Hotel bandung
Tanggal        :

  • 13 – 15 Februari 2013  (Bacth I)
  • 1 – 3 Mei 2013 (Bacth II)
  • 28 – 30 Agustus 2013 (Bacth III)
  • 19 – 21 November 2013 (Batch IV)

INVESTASI

  • IDR 7.499.000,-/participant non residensial.
  • For send 3 participant discount 10 %.

 FASILITAS

  • Meeting Room Hotel ****
  • Training KIT
  • Souvenir
  • Sertifikat
  • 2 X Coffe Break + Lunch

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
  14. Captcha
 

cforms contact form by delicious:days