POMPA RENDAM / SUBMERSIBLE PUMP

POMPA RENDAM / SUBMERSIBLE PUMP: INSTALATION. OPERATION AND MAIANTENANCE
Hotel Ibis Malioboro, Yogyakarta | 24-26 April 2012  | 08.00-16.00 WIB | IDR 7.500.000,-
Hotel Harris Tebet, Jakarta | 19-20 Juni 2012 | 08.00-16.00 WIB | IDR 7.500.000,-
Hotel Ibis, Semarang | 16-17 Oktober 2012 | 08.00-16.00 WIB | IDR 7.500.000,- 
Hotel Scarlet Dago , Bandung | 11-12 Desember 2012 | 08.00-16.00 WIB | IDR 7.500.000,

 

 

DESKRIPSI

This course is to summarize the state of the art of Electric Submersible Pump (ESP) technology. It included the example problems to illustrate the use of various theoretical solutions, it also listed an overview of conventional well productivity and Inflow Performance Relationship (IPR) technology and is general introduction to the latest methods of  production optimization using ESP technology.

This course compiled as aid to engineers and production people in the Petroleum Industry who have the responsibility of planning and selecting electrically driven submersible pumping equipment. Included are fundamental principles involving sizing, operation and trouble shooting of submersible pump equipment. Also included are tables, data and general information which it will be value to everyone who utilize s submersible pumping equipment.

Much material of this course has been published previously and is reassembled in this course. However, there is also a considerable amount of new material included that will assist the participants of the course  in their pump selection and operation.

Designing a submersible pump installation is not an exact science; it is mostly an art. But it is a talent which can be easily acquired if care and attention are paid to what the well is telling us, and what we want to do with the well. The well conditions vary from one well to other, but the basic information required for a design does not. What we require from a particular well must, of course, be within the limits of the well in question.

This course is mainly directed to the practicing professionals who make engineering calculations and decision on submersible pump application and troubleshooting. For managers, the course helps to review the present state of the art. It also outlined some of new method in artificial technology exist today. These gaps in technology will be useful for research engineers and research professionals to determine the areas of future research.

TUJUAN

After having been trained, all trainees are expected to be able to implement good laboratory practices and have a deep knowledge of monitoring the performance of their laboratory


MATERI

  • Introduction
  • Hydraulic& Electrical Fundamentals
  1.  Introduction
  2. Hydraulic Fundamentals
  3.  Centrifugal Pump Hydraulics
  4. Well Performance
  5. Electricity Fundamentals
  • Equipment Description
  1.    Introduction
  2. Centrifugal Pump
  3.  Rotary Gas Separator
  4.  Seal Section
  5. Electrical Submersible Motor
  6.  Generalized Motor Composite Curves
  7. Motor Controllers
  8.  VSC Effects on ESP Components
  9.  Down hole Pressure and Temperature Monitors
  10. Transformers
  11.   Junction Box
  12.    Wellhead
  13. Check Valve
  14.   Drain Valve
  15. Backspin relay
  16.  Centralizer
  17.   Cable
  18.   Cable Bands
  19.  Motor Lead Extension
  • Typical ESP Applications
  1.  Introduction
  2. Shrouded Configuration
  3. Booster Pump
  4. Direct Production-Injection-System
  5. Horizontal Injection System
  6. Cantle slopeâ Injection System
  7. ESP Installation with Deep Set Packer
  8.  ESP Installation with “Y” Tool
  9. Bottom Intake Booster Pump
  10.  Operation of Submersible Pumps in Harsh Environments
  11.   Equipment Sizing
  12.  Introduction
  13. Basic Data Required
  14.    Sizing Procedure High-Water-Cut
  15.   Sizing example : High-Water-Cut
  16.   Effect of Viscosity on Centrifugal Pump Performance
  17.   Sizing Procedure for Viscous Fluids
  18.  Sizing Example: Viscous Fluids
  19.   Sizing Procedure High GOR
  20.  Sizing Example High GOR
  21.  Sizing Procedure Variable Speed
  22.  Sizing Example: Variable Speed
  • Installation Maintenance and Trouble shooting
  1.  Introduction
  2. Equipment Transportation
  3.   Equipment Handling
  4. Well Preparation
  5.   Installation of Down hole Equipment
  6.   Installation of Surface Equipment
  7.   Starting  ESP
  8.  Testing
  9.   Data Gathering
  10. Re-running Equipment
  11. Economic Evaluation
  12. Failure Analysis
  13.  Ammeter Technology
  14.  Field Checkout
  15. ESP Troubleshooting Chart
  •  Engineering Data
  1.  ElePe
  2. ctrical Terms and Definition
  3.   Useful Formulas
  4.  Relationships Regarding Flow and Pressure drops in Pipes
  5. Temperature Rise in Pumps
  6.  Measurement for Water Flow
  7. Areas of Circles
  8. Conversion Factors
  9.  Temperature Conversion Table
  10.  Fundamental Unit of Length, Area, Volume and Mass
  11. Conversion Factors For Units of Energy
  12. Casing and Tubing Sized and Capacities
  13.    Stretch of  Suspended Casing, Tubing or Drill Pipe
  14.   Tubing Weight in Fluid
  15.   Hydrostatic Head
  16.  Well Temperature versus Current
  17.  Absolute Viscosity of Gas-Free Crude Oil, Centipoises
  18. Absolute Viscosity of Gas-Saturated Crude Oil, Centipoises
  19.   Pressure Loss Charts
  20. Flow Loss due to Friction in API. Pipe (U.S)
  21.  Inflow
  22. rformance relationship Equations
  •  Installation, Operating And Troubleshooting The Pump
  •  Cases study and discussion


PESERTA

Engineer/ Superintendent/ Supervisor Production, Power Plant Engineer/ Superintendent/ Supervisor Petroleum Engineer Everybody who wants to add the knowledge and gain benefits from this course

INSTRUKTUR

Yogya : Ir. Nursuhascaryo, MT
Bandung : DR. Ir. Sudjati Rachmat, DEA

 

METODE

Presentation, Discussion, Case Study, Evaluation, Post-Test & Pre-Test

WAKTU DAN TEMPAT

  • 24-26 April 2012                 | Jogjakarta : Hotel Ibis Malioboro Yogyakarta
  • 19-20 Juni 2012                  | Jakarta  : Hotel Harris Tebet
  • 16-17 Oktober 2012            | Semarang: Hotel Ibis
  • 11-12 Desember 2012         | Bandung : Hotel Scarlet Dago 

INVESTASI

Rp. 7.500.000,- /orang (Non-Residential)

FASILITAS

Certificate, Training Kit, Module / Handout, Lunch, Coffee Break, Souvenir

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
  14. Captcha
 

cforms contact form by delicious:days