Preventive and Predictive Maintenance – YOGYAKARTA
Hotel IBIS, Yogyakarta | 29 – 31 Desember 2011 | IDR 6.000.000,- (PASTI JALAN)
All Seasons, Yogyakarta | 24-26 Januari 2012 | IDR 5.000.000,-
All Seasons, Yogyakarta | 29-30 Maret 2012 | IDR 5.000.000,-
All Seasons, Yogyakarta | 1-3 Mei 2012 | IDR 5.000.000,-
MATERI
WHY PREVENTIVE & PREDICTIVE MAINTENANCE
- Apprising maintenance performance and effectiveness
- Typical maintenance controls
- Reactive maintenance
- Anticipative maintenance
- Ascertainment of equipment condition
- The need for preventive maintenance
- Why preventive maintenance
- Preventive Predictive maintenance objectives
- Preventive Predictive maintenance prerequisites
- Preventive maintenance feasibility analysis:
- Policies
- PM program functions
- Cost impact
- Saving potential
DEVELOPING THE preventive PREDICTIVE MAINTENANCE PROGRAM
- Assignment of organizational responsibilities typical maintenance functional assignments operational concepts
- Equipment to be included
- Equipment inventory sheet’ examples
- Equipment numbering concepts
- The PM work order:
- Developing the inspection sheet
- ECS rating sheet as cross reference
- Sample of equipment components
- Spare parts and material needs
- Inspection sheet examples
- Determining the frequency cycle:
- Frequency cycle examples
- Scheduled frequency overview
- Developing job safety practices � typical examples
- Considering manual versus computerization
- Predictive maintenance can determine maintenance requirement
- Predictive maintenance and its applied techniques as part of the PM program:
- Vibration analysis
- Wear particle analyzing
- Thermography
IMPLEMENTATION OF PREVENTIVE MAINTENANCE PROGRAM
- Job planning
- The planning function
- Planning, Service to do
- Job planning prerequisite
- Planners qualifications
- Duties and responsibilities of planners
- The hob package
- Line supervisors qualifications
- Planning permits Us, to forecast, communicate and measure
- What job should be planned
- Time required to perform work labor content
- Standard defined
- Consistency of estimating
- Estimating methods
- Work backlog
- Scheduling of maintenance work:
- PERT and CPM as scheduling tools
- Loading of the PM work order
- Load leveling
- Weekly scheduling
- Manpower requirements forecasting
- Forecasting by crew
- Forecasting by department
- Weekly schedule – Computer and manual example
- Training of personnel
CONTROLLING THE PREVENTIVE PREDICTIVE MAINTENANCE PROCESS
1. Preventive maintenance administration
- Planned maintenance
- Special tools and equipment
- Service user coordination
2. Equipment availability
- Service user notification � examples
- Automotive notification – examples
3. Control reporting
- What should be included
- Schedule for supervisor
- Schedule for supervisor service user
- Overdue for maintenance and service user
- Missed PM report for maintenance and service user
- Complete PMs
- Summary report of all PMs completed
- Listing of all PMs set-up in program
- Planning and scheduling index example
4. Assurance of work performed
5. Conformance and auditing
6. Feedback evaluation/corrective action cycle
PARTICIPANTS
Publik
METODE
lecturing, workshop, interactive consultation, and case study
INSTRUKTUR
- Dr. Ir. Rini Dharmastiti, M.Sc.
WAKTU dan TEMPAT
- Hotel IBIS Jl. Malioboro No.52 -58 Yogyakarta
- 29 – 31 Desember 2011
- 24-26 Januari 2012
- 29-30 Maret 2012
- 1-3 Mei 2012
INVESTASI
- IDR 6.000.000 – (non residential ) >> 2011
- IDR 5.000.000,- (non residential ) >> 2012
- (termasuk picking-up service dari Bandara/Stasiun KA ke hotel, training modul, training kit, 2x coffee break, 1x lunch, souvenir, dan sertifikat)