PRODUCTION OPERATION AND PROBLEM SOLVING

PRODUCTION OPERATION AND PROBLEM SOLVING

Bandung | 27 – 29 Mei 2019 | Rp. 7.950.000 Per Peserta
Bandung | 24 – 26 Juni 2019 | Rp. 7.950.000 Per Peserta
Bandung | 24 – 26 Juli 2019 | Rp. 7.950.000 Per Peserta
Bandung | 14 – 16 Agustus 2019 | Rp. 7.950.000 Per Peserta

Jadwal Training 2019 Selanjutnya …

 

 

PRODUCTION OPERATION AND PROBLEM SOLVING TRAINING DESCRIPTION

How to optimize the production and solve many kind of problems in oil and gas production. Comprehend basic principles of calculation and conduct optimization when wells production operation, oil wells, gas and geothermal reservoir implemented.

 

DESIGNED FOR

Operator, Senior Operator, Engineer/Non Engineer

 

YOU WILL LEARN

Participants will learn:

  1. Comprehend basic principles of calculation and conduct optimization when wells production operation, oil wells, gas and geothermal reservoir implemented
  2. Develop this production optimization implementation to improve wells and fields performance and production
  3. Conduct simple diagnosis and comprehend settlement problems on production wells operation of, oil wells and gas and geothermal reservoir
  4. Create a simple analysis of wells oil, gas and geothermal data, forecast performance and plan production operations development
  5. Conduct simple quantitative calculations entire acquisition data: tubing, flowline, chokes, perforation, gravel-pack, sub-surface safety, wells valve, plan its development by considering capability from each well
  6. Practice knowledge of production operation for settlement problems occur when cementation process, handling scale, sand, corrosion and damage of oil and gas wells
  7. Understanding basic principles on design: cementation, workover, wells stimulation with acidizing and hydraulics rupture, planning workover, etc.

 

PRODUCTION OPERATION AND PROBLEM SOLVING TRAINING MATERIAL OUTLINE

  1. Geologic Considerations in producing Operation
  • Introduction
  • Sandstone Reservoirs
  • Geologic Factors Affecting Reservoir Properties in Sandstone
  • Application of Geologic concepts in Specific Sandstone
  • Carbonate Reservoirs
  • Application of Geologic Concepts in Carbonate Reservoirs
  1. Reservoir Considerations in Well Completions
  • Introduction
  • Hydrocarbon Properties of Oil and Gas
  • Recommendations of Obtaining Good Test Data
  • “Eyeball” Interpretation of Pressure Charts
  1. Primary Cementing
  • Introduction
  • Cementing Materials
  • Cement Additives
  • Cement Bonding
  • Flow Properties of Primary Cements
  • Displacement Mechanics
  • Cost of Primary Cementing
  • Special Problem Situations-New Developments
  • Primary Cementing Practices
  1. Well Completion Design
  • Factors Influencing Well Completion Design
  • Conventional Tubular Configuration
  • Unconventional Tubular Configurations
  • Sizing Production Tubular
  • Completion Interval
  • Permanent Well Completions (PWC)
  • Tubingless Completion
  1. Tubing Strings,Packers,Subsurface Control Equipment
  • Tubing Strings
  • Steel Grades
  • Tubing Connections
  • Makeup of API Threaded connection
  • Design of Tubing Strings
  • High Strength Tubing
  • Physical Properties of Steel
  • Sensitivities of High Strength Tubing
  • Tubing Inspection
  • Tubing Handling Practices
  • Equipment for Use With-Strength Tubing
  • Tubing Running Practices
  • API Publication List
  • Packers and Subsurface Control Equipment
  • Production Packers
  • Subsurface Control Equipment
  1. Perforating Oil and Gas Wells
  • Introduction
  • Types of Perforators
  • Evaluation of Perforator Performance
  • Factors Affecting Gun Perforating Results
  • Perforating in a Clean Fluid with Differential Pressure Into Wellbore
  • A Comparison between the GEO-VANN System and Other Perforating Methods in Wells
  • Equipped with Packers
  1. Completion and Workover Fluids
  • Functions-Requirements-Selection Criteria
  • Formation Damage Related to Solids
  • Oil Fluids-Practical Application
  • Conventional Water-Base Mud
  • Oil Base or Invert-Emulsion Muds
  • Foam
  • Perforating Fluids
  • Packer Fluids
  • Well Killing
  1. Through-Tubing Production Logging
  • Introduction
  • Logging Device
  • Application of Through-Tubing Production logging
  • Field Examples of Production Logging Techniques
  • Primary Cement Evaluation
  1. Problem Well Analysis
  • Problem Wells
  • Problem Well Analysis Checklist
  1. Parafin and Asphaltene
  • Introduction
  • Paraffin and Asphaltene Chemistry
  • Deposition Mechanisms
  • Removal of Wax Deposits
  • Preventing or Decreasing Wax Deposition
  • Design of Wax Control
  1. Squeeze Cementing-Remedial Cementing
  • Introduction
  • Theoretical Considerations
  • Practical Considerations
  • Special Squeeze Cementing Situations
  • Planning a Squeeze Cement Job
  • Normal Operational Procedures
  • Other Operational Procedures
  • Plug-Back Operations
  • Special Cement Systems
  1. Sand Control
  • Introduction
  • Reduction of Drag Force
  • Mechanical Methods of Sand Control
  • Practical Considerations in Gravel Packing
  • Use of screen Without Gravel
  • Resin Consolidation Methods
  1. Formation Damage
  • Introduction
  • Basic Causes of Damage
  • Classification of Damage Mechanisms
  • Reduced Absolute Permeability
  • Increased Fluid Viscosity (Emulsion)
  • Diagnosis of Formation Damage
  1. Surfactants for Well Treatments
  • Characteristics of Surfactants
  • Use and Action of Surfactant
  • Formation Damage Susceptible to Surfactant Treatment
  • Preventing or Removing Damage
  • Well Stimulation With Surfactants
  • Increasing Effectiveness of Rod Pumping
  • Prevention of Well Damage
  1. Acidizing
  • Acids Used in Well Stimulation
  • Acid Additives
  • Carbonate Acidizing
  • Acidizing Techniques for Carbonat Formations
  • Sandstone Acidizing
  • Potential Safety Hazard in Acidizing
  1. Hydraulic Fracturing
  • Introduction
  • Mechanics of Fracturing
  • Production Increase from Fracturing
  • Propping the Fracture
  • Frac Fluids
  • Frac Job Design
  • Frac Job Evaluation Techniques
  1. Scale Deposition,Removal,and Prevention
  • Introduction
  • Causes of Scale Deposition
  • Prediction and Identification of Scale
  • Scale Removal
  • Scale Prevention
  1. Corrosion Control
  • The Corrosion Process
  • Detection and Measurement of Corrosion
  • Corrosion Control
  1. Workover and Completion Rigs Workover System
  • Conventional Production Rigs
  • Non-Conventional Workovers System
  • Concentric Tubing Workovers
  1. Workover Planning
  • Reasons for Workover
  • Workover to Alleviate Formation Damage
  • Workover for Low Permeability Well
  • Workover of Wells in Partially Pressure-Depleted Reservoirs
  • Workover to Reduces Water Production in Oil and Gas Wells
  • Workover to Reduces Gas Production in Oil Wells
  • Workover for Sand Control
  • Workover to Repair Mechanical Failure
  • Workover to Change Zones or Reservoirs
  • Workover to Multicomplete
  • Workover to Increase Production in Well Producing High Viscosity (Low Gravity) Oil
  • Workover Economics

 

INSTRUCTOR :  Dr.-Ing. Bonar Tua Halomoan Marbun  and Team

 

VENUE :  Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

 

TRAINING DURATION :  3 days

 

JADWAL TRAINING 2019

  1. 27 Mei 2019-29 Mei 2019
  2. 24 Jun 2019-26 Jun 2019
  3. 24 Jul 2019-26 Jul 2019
  4. 14 Agust 2019-16 Agust 2019
  5. 11 Sep 2019-13 Sep 2019
  6. 23 Okt 2019-25 Okt 2019
  7. 13 Nop 2019-15 Nop 2019
  8. 16 Des 2019-18 Des 2019

 

INVESTMENT PRICE/PERSON :

  1. Rp. 7.950.000/person (full fare) or
  2. Rp. 7.750.000/person (early bird, payment 1 week before training) or
  3. Rp. 7.500.000/person (if there are 3 persons or more from the same company)

 

FACILITIES FOR PARTICIPANTS:

  1. Training Module
  2. Flash Disk contains training material
  3. Certificate
  4. Stationeries: NoteBook and Ballpoint
  5. T-Shirt
  6. Backpack
  7. Training Photo
  8. Training room with Full AC facilities and multimedia
  9. Lunch and twice coffeebreak every day of training
  10. Qualified Instructor
  11. Transportation for participants from hotel of participants to/from hotel of training – VV (if minimal participants is 4 persons from the same company)