Production Optimization Of Oil & Gas
Melia Purosani Hotel, Yogyakarta | 25 – 28 November 2013 | Rp 9.000.000,- / participant
OBJECTIVES
- Make basic PVT properties and inflow performance calculations related to artificial lift
- Understand and apply multiphase tubing and pipe flow principles
- Select the appropriate artificial lift system
- Compare systems to determine what system is most economically feasible
- Specify components and auxiliary equipment needed for each system
- Know what best practices are available to extend the life of equipment and installed lift systems
- Apply basic design and analysis concepts
- Design system features that allow for gassy production, production with solids, viscous production, and for other harsh environments.
COURSE CONTENTS PRODUCTION OPTIMIZITATION Of OIL & GAS
- Introduction
- Artificial Lift Systems
- Overview – Nodal Analysis
- Oil Well Flow Prediction
- Gas Well Loading Prediction
- Selection of Artificial Lift Methods
- Gaslift
- Electric Submersible Pumps
- Jet Pumps
PARTICIPANTS
Engineers, technicians, field supervisors, and others who select, design, install, evaluate, or operate artificial lift systems.
TRAINING METHOD
Presentation, Discussion, Case Study, Evaluation
Instructor by :
I Nengah Diasta
TRAINING FEE
Rp9.000.000,- / participant / Non residential
(minimum 3 peserta training pasti jalan)
DATE AND PLACE
- 25 – 28 November 2013
- Melia Purosani Hotel Yogyakarta
FACILITIES
- Training Kit
- Handout
- Certificate
- 1 x Lunch
- 2 X Coffee Break
- Souvenir