Steam Turbine Performance

Steam Turbine Performance

Golden Flower Hotel, Bandung | 19 – 21 November 2013 |  Rp 5.800.000

 

COURSE OUTLINE STEAM TURBINE PERFORMANCE

  • Effect of power plant operation on turbine efficiency, heat rate, and power output
  • Diagnostic techniques to pinpoint location and types of damage
  • Testing programs to determine location and extent of deterioration
  • Diagnostic test data using case histories as examples
  • Optimum turbine design evaluation of proposed efficiency improvements
  • Steam path audit techniques to reduce repair and replacement costs

 

PESERTA

Plant Engineers, Performance Engineers, Turbine Engineers, Turbine Systems Engineers, Operations and Maintenance Superintendents and Managers, and Plant Managers

 

TRAINING METHOD

Presentation, Discussion, Case Study, Evaluation

 

TRAINING FEE

  • Rp5.800.000,- / participant / Non residential
  • (minimum 5 peserta training pasti jalan)

 

DATE AND PLACE

  • 19 – 21 November 2013
  • Golden Flower Hotel Bandung

 

FACILITIES

  • Training Kit
  • Handout
  • Certificate
  • 1 x Lunch
  • 2 X Coffee Break
  • Souvenir

 

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
  14. Captcha
 

cforms contact form by delicious:days