Wellhead Instrumentation And Hydraulic Control Systems

Wellhead Instrumentation And Hydraulic Control Systems

Bandung | April 07 – 09, 2015 | Fee at proposal



A wellhead is a general term used to describe the component at the surface of an oil or gas well that provides the structural and pressure‐containing interface for the drilling and production equipment. The primary purpose of a wellhead is to provide the suspension point and pressure seals for the casing strings that run from the bottom of the hole sections to the surface pressure control equipment. Once the well has been drilled, it is completed to provide an interface with the reservoir rock and a tubular conduit for the well fluids. The surface pressure control is provided by a christmas tree, which is installed on top of the wellhead, with isolation valves and choke equipment to control the flow of well fluids during production.



Objective: You will be able to

  • Understand the well activities
  • Understand the concept of wellhead
  • Understand the instrumentation and control
  • Know the instrumentation and control
  • Understand the hazardous area at wellhead
  • Understand the valves and choke valves
  • Understand the safety marking of instrumentation
  • Understand the schematic diagram
  • Understand the specification break in P&ID
  • Know the control systems



Instructor:

Ir.Endra Joelianto, Ph.D. is an expert in control engineering and industrial automation. His outstanding research is: Hybrid Control Systems, Discrete Event Control Systems, Petri Nets Analysis and Application on PLC, Robust and Advanced PID Controller and its implementation on PLC, DCS, Fieldbus, Industrial automation and Advanced Control System Designs. He received first degree (Ir.) in Engineering Physics in 1990 from Department of Engineering Physics, ITB and Doctor of Philosofy (PhD.) in Control Engineering in 2001 from Department of Engineering, The Australian National University, Canberra, Australia. He is Head of Intelligent Control and Automation Laboratory and Coordinator of PLC Research Group for research and training, Engineering Physics Study Program and Instrumentation and Control Research Division, Institut Teknologi Bandung. He was Director of Schneider‐OMRON PLC Training Center, Maranatha Christian University, Bandung. He is the chairman of National Student Competition on PLC Programming held regularly since 2007 in ITB. He serves as instructor either for public or for in‐house training on instrumentation and process control to universities, industries, petrochemical or oil and gas companies, such as: PT. NGL Arun, PT. NGL Bontang, PT. Pupuk Iskandar Muda, PT. Pupuk Kalimantan Timur, PT. Pupuk Kujang, PT. Semen Padang, PT. Semen Gresik, PT. Semen Cibinong, PT. Indocement, PT. Semen Tigaroda Perkasa, PT. Exspan Nusantara, PERTAMINA, British Petroleoum, Maxus, Gulf, PT. Chevron Geothermal, PT. Chevron Pacific Indonesia, PetroChina, ConoccoPhilip, PT. Nusa Halmahera Minerals, Unocal, PJB, Immanuel Hospital, LIPI‐Bandung, LAPI‐ITB, PT. Indonesia Power, Total Indonesie, Star Energy, CNOOC Ses, Premier Oil, Pearl Oil, MEDCO, etc. He has delivered more than 150 professional training programs on Instrumentation and Control. He also serves as instrumentation and control design and consultant, PT. INALUM, PT. Badak NGL, Ministry of Energy and Mineral Resources Indonesia.

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
  14. Captcha
 

cforms contact form by delicious:days